【ECF Weekly】National Energy Administration: Promote Shale Energy
【ECF Weekly】National Energy admin126459646istration: Promote Shale Energy
chinashalegas
页岩油气、致密油气、煤层气等非常规能源与常规能源研究平台,提供能源咨询、调研、科技评价与信息服务。
ECF China Shale Weekly Review - Jul 31, 2022
Policy & Regulation
【 National Energy admin126459646istration: Vigorously Promote Shale Oil and Shale Gas 】 National Energy admin126459646istration organized a meeting to vigorously enhance oil and gas exploration and development. The meeting called for vigorously promoting shale oil and shale gas as a strategic continuation field, strengthening the development direction of unconventional oil and gas, and accelerating the development of unconventional resources.
【 Shaanxi Province: 15billion Cubic Meters of Natural Gas Construction 】 The construction of Yanchang Petroleum production ,whose annual capacity is 15 billion m3, was held in Yan’an, Shanxi Province.
Exploration & Production
【 Fracturing Work in Central Hebei Breaks Two Records 】 YS69050 team of Bohai Drilling Company completed the fracturing construction with the maximum displacement of 16.24 cubic meters p er minute and the amount of sand entering the well in the third section of 200.17 cubic meters, breaking the two records of the maximum displacement of fracturing and the amount of sand entering the well in a single section in central Hebei.
【 Fuling Gas Field Obtains High-Yield Oil and Gas Flow 】 Xingye L1HF well in Fuling Shale Gas Field of Sinopec Jianghan Oilfield has completed the test and obtained high-yield industrial oil and gas flow, including oil production of 43.9 m3 / day and gas production of 14400 m3 / day.
【 COSL Completes the First Batch of Deep Coal Seam Well Fracturing Operations 】 The fracturing construction of the first two deep coal seam wells of COSL was completed. The amount of fluid entering a single well is more than 2000 m3, the amount of sand entering a single well is 200 m3, the construction displacement of a single well is up to 14 m3 / min.
Technology & Equipment
【 Construction of the Largest Ultra Deep Condensate Gas Field in China Started 】 Construction of the 10billion cubic meter production capacity project in the ultra deep gas area of Tarim Oilfield started, marking the development of China’s largest ultra deep condensate field.
【 CPTEC Set a New Record for the Group in Coiled Tubing Ultra Deep Horizontal Well 】 CPTEC successfully completed the cleaning and perforating operations of coiled tubing for three wells on the platform, with the maximum operating depth of 6930 meters, once again breaking the record of the group company for the maximum depth of coiled tubing in horizontal wells.
【 Cumulative Production of North China Oil and Gas Filed Well J66-4-7 Exceeds 9 Million Cubic Meters 】 The cumulative gas production of well J66-4-7 of North China Oil and Gas Company exceeds 9million cubic meters. The well has been in continuous production for 390 days with stable production.
Past Weekly News
【ECF Weekly Jul 24, 2022】CNPC Half Year Net Profit Exceeded 80 Billion Yuan
【ECF Weekly Jul 10, 2022】 Fuling Shale Gas Output Hit Record High
Source: Energy China Forum
一键三连[分享]、[点赞
] 和 [赏],
点这里
-
2023年血糖新标准公布,不是3.9-6.1,快来看看你的血糖正常吗? 2023-02-07
-
2023年各省最新电价一览!8省中午执行谷段电价! 2023-01-03
-
GB 55009-2021《燃气工程项目规范》(含条文说明),2022年1月1日起实施 2021-11-07
-
PPT导出高分辨率图片的四种方法 2022-09-22
-
2023年最新!国家电网27家省级电力公司负责人大盘点 2023-03-14
-
全国消防救援总队主官及简历(2023.2) 2023-02-10
-
盘点 l 中国石油大庆油田现任领导班子 2023-02-28
-
我们的前辈!历届全国工程勘察设计大师完整名单! 2022-11-18
-
关于某送变电公司“4·22”人身死亡事故的快报 2022-04-26
