Simulation analysis of construction process of high rock slope's stabilization Simulation analysis of construction process of high rock slope's stabilization

Simulation analysis of construction process of high rock slope's stabilization

  • 期刊名字:哈尔滨工业大学学报(英文版)
  • 文件大小:
  • 论文作者:ZHU Zhan-yuan,LING Xian-zhang,
  • 作者单位:School of Civil Engineering,Information and Engineering Technology College,Zhengyuan Construct Company of Shandong Provi
  • 更新时间:2022-10-15
  • 下载次数:
论文简介

A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope' s stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and dis-placement vector graphs at different construction steps were obtained, and the behavior of the slope during stabi-lization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper;the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time ; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method.

论文截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。