Rock parameters inversion for estimating the maximum heights of two failure zones in overburden stra
- 期刊名字:矿业科学技术
- 文件大小:
- 论文作者:Lu Haifeng,Yuan Baoyuan,Wang L
- 作者单位:College of Earth Science and Engineering,Chizhou Land Resources Institute of Planning & Survey
- 更新时间:2022-09-17
- 下载次数:次
In order to enter effective parameters of rock mass in a numerical model, the relationships between mechanical parameters of rock and rock mass were obtained by an inversion method and an orthogonal test, given our measurements of the maximum heights of two failure zones in the Longdong coal mine.Using the maximum heights of the caving zone and the water-conducting fractured zone as test indices the modulus of elasticity, the Poisson ratio, cohesion and tension strength as test factors and different values of reduction enhancement factors as test levels, an orthogonal test was designed to obtain an optimum simulation scheme. From the analysis of different values of reduction enhancement factors which affect the test indices, an optimum factor combination for modification of parameters could be inferred. By using modified parameters in our numerical simulation, the maximum heights oftbe caving zone and the water-conducting fractured zone in the extensive Xiyi area were determined as 15.06 m and 36.92 m. These values were almost the same as those obtained by similar material simulation (8.5 m and 37.0 m) and empirical prediction (8.4 m and 34.4 m). These results indicate that the modification of parameters is a rational method.
-
C4烯烃制丙烯催化剂 2022-09-17
-
煤基聚乙醇酸技术进展 2022-09-17
-
生物质能的应用工程 2022-09-17
-
我国甲醇工业现状 2022-09-17
-
JB/T 11699-2013 高处作业吊篮安装、拆卸、使用技术规程 2022-09-17
-
石油化工设备腐蚀与防护参考书十本免费下载,绝版珍藏 2022-09-17
-
四喷嘴水煤浆气化炉工业应用情况简介 2022-09-17
-
Lurgi和ICI低压甲醇合成工艺比较 2022-09-17
-
甲醇制芳烃研究进展 2022-09-17
-
精甲醇及MTO级甲醇精馏工艺技术进展 2022-09-17
