OIL DEPOT AND GAS STATION OIL DEPOT AND GAS STATION

OIL DEPOT AND GAS STATION

  • 期刊名字:石油库与加油站
  • 文件大小:800kb
  • 论文作者:
  • 作者单位:
  • 更新时间:2020-09-13
  • 下载次数:
论文简介

Bimonthly, StartefPublication in 1992OIL DEPOT AND GAS STATIONVol. 21, No. 1No. 119 totallyFeb20,2012Honorary Chairman of Editorial Committee: Li Chunguang, Zhang haichaoContents and abstractsChairman of Editorial Committee: Zuo XingkaiVice Chairman of Editorial Committee: Guo FeihoSTORAGE TECHNOLOGIESng, Wang Weimin, An Shan1. Realization of Quantitative Loading Control ofMembers: Zhang Xilai, Wang Hongchuan, Xu Fubin,I Rail Tankers Using Continuous MeasurementZhang zia, Feng Peiyu, Li Yuxing, Rui Jiqiang, Principle of Radio Frequency Admittance. ZhanChen Biwen, Yin Chaoming, Ren Shixian, Du Yubin,JiajunYang Jiming, Huang He, Li Yiqing, Zheng Jinghua, Abstract: Aiming at the study on the automationJia Yuepeng, Lun Kaiyong, Yan Hua, Huang bingliLiu Xiangbin, Zhang Tianming, Luo Tonghua, Niuf rail tankers loading, the design conception ofJingmin, Wang Jinpei, Han Qingyue, Liu Huabin, Wangusing directly radio frequency admittance liquidMin, Han Jie, Xia Fengwu, Wang An, Dai Fujun, Zhou level meter to measure the liquid level of tankerXuehong, XU Jiangqiao, Liu Sheng, He Ming, Song and then check the volume according to tankerWei, Bu Wenping, Zhang Yi, Du Daolin, Shen Qingql, volume table is proposed as the alternative of rou-Du Hongyan, Zhou Jiaxiang, Han Jun, Jin WangangDirector: Zuo Xingkaitine measuring method using flowmeter. TheVice Director: Guo Feihongstructure of radio frequency admittance liquid levelEditor-in-Chief: Wang Weiminmeter and the principle for continuous measure-Vice Editor-in-Chief: Jin Wangangment, and the possibility of realizing measurementEditor-in-Charge: Zhang YResponsible Department: China PetrochemicalCorporation (SINOPEC)CKeyword: storage automation, radio frequencySponsor: SINOPEC Sales Companyadmittance liquid level meter, quantitative loadPublisher: Editorial Office of Oil Depots and OiltationDistributor(Domestic): Editorial Office of Oil De-4. All- Weather Magnetic Breather Valve. Gaopots and Oil StationsSongzhu, Tang Junfeng, Zhao Shuzhong, XuAddress:Building No 6, Guangqujiayuan, Dongcheng PingDistrict, BeijingAbstract The structure, working principle andPostcode: 100022Tel:(010)67006041;67006042technical features of all weather magnetic breatherFax:(010)67006043E-mail:sykjyz@sina.comand different operating conditions of large/smallDistributor(Abroad): China National Publication breathing were analyzed, and the technical perfor-mance of the valve was describedPrinter: Fei Teng Printing Co Ltd of langfangAddress: No 25, Yonghua Dao Ave LangfangKeyword: oil depot, breathing valve all-weathPostcode: 065000er, magnetic.ISSN1008-2263;CN11-3945/TESAFETY TECHNOLOGYNo. of Ad. License: 0135, Chaoyang District,6. Reason Analysis on Boil-over in Heavy OilBeijingTank atDomestic Price: RMB60 per yearangangAbstrac中国煤化工Copyright gor all originally published reportsCNMHGheavy oil tanks, according to the physical properties electrical equipmentof heavy oil, the reasons causing borboil-over acci- Keywords: oil depot, explosion proof, electrical e-dents of heavy oil were analyzed. The temperature quipment, measure.parameter controlled for heavy oil storage was dis- 16. The Self-Protection of Staff in Gas Stationussed theoretically, and precautions for preventing Zhou Yunli, Yang Xiaojie, Zhang Zhengangheavy oil were proposed, which had Abstract: The dangers faced by gas station staff arecertain guiding significance for heavintroduced. It is proposed that the gas station staffand actual productionshould study safety knowledge, improve self-pro-Keywords: heavy oil tank, residue, boil-over, tection measures and safety technological abilitycautionreduce hazard to minimum degree, in order to en8. Application and Developing Trend of Video sure the personnel safety of gas station staffMonitoring System in Oil Depot. Zhao XingweiKeyword: gas station, staff, self-protectionAbstract: Based on the introduction of selection ofmeasurecamera and hard disk video recorder during upgrad- ENVIRONMENT PROTECTIONing of monitoring system in Shoushan Oil Depot in 18. Study on Ecological Environment Protection2010, the standard and factors considered for selec- Measures of Oil Storage Depot. Chen Siwei,Chention of camera and hard disk video recorder were Shuhai, Tang Shunwudescribed. The developing trend of oil depot moni- Abstract: The main pollution sources of oil storagetoring system was prospected, i. e. video monitor- depot were analyzed comprehensively from the as-ing system has integrated digital technology and re- pects of design, construction, and routine operamote expanding system, high resolution video,I tion. In order to reduce the influence on environlong distance digital transmission, mass storage ment to minimum degree during oil depot designhave become the tendency of above-mentioned construction and daily operation, the correspondingsystemmeasures should be adopted adopt various meaKeywords: video monitoring, oil depot, applica- sures to reduce oil leakage and hydrocarbon vaportion, developing trendization: treat the wastewater to meet theSAFETY MANAGEMENTments of discharge standard; treat the solid waste11. Safety Management of High Place Work in Gas to harmlessness; adopt low noise equipments andStation Construction. Zou Xiujianuse vibration reduction, sound isolation measures;Abstract: The reasons causing accidents during establish corresponding accident prevention strate-high place work in gas station construction were gyanalyzed. The countermeasures for preventingKeywords: oil storage depot, ecological environ-dents of high place work were presented in order to ment protection, safety strategyavoid accidents of high place work21. Fault Analysis on Oil Vapor Recovery SystemKeywords: gas station construction, high place in Gas Station. Zhang Wenfengwork, safety managementAbstract: The structure of oil vapor recovery sys14. Safety Prevention Measures of Explosion Proof tem in gas station was described briefly, and theElectrical Equipment in Oil Depot. Ren Junqiang. faults appearing in the application of distributedAbstract: According to the features of oil depottwo-stage oil vapor recovery system and the troudustry,the safety prevention measures were pro- bleshooting method were emphasizedposed from three aspects of reasonable selection of Keyword: gas station, oil vapor recovery, faultexplosion proof electrical equipment, proper instalanalysis, m中国煤化工lation of electrical equipment, and maintenance of I QUANTITYCNMHGEMENTⅢ125. Analysis and Management on Loss of Product34. Discussion on Capital Construction ArchivesOil during Oil Tanker Handling Process. Gao Establishment and Developing Trend in Gas Staion. Bei ZhimeiAbstract: The reasons causing product oil loss dur- Abstract: Taking the collection, arrangement, fil-ing oil tanker loading and unloading were analyzed,I ing, and borrowing as the key control points, conincluding non human factors and human factors. structing scientific andegular archives manageAccording to the reasons, the practical measures for ment procedure, and implementing strictly archivesreducing and controlling product oil loss were pre- management business standard were the main consentetent of capital construction archives establishmentKeyword: product oil loss, oil tanker, product oil Taking the new gas station as example, the basicmetering, metering managementmanagement flow and control method of capital27. Evaluation on Uncertainty of Measurement Re- construction archives establishment were explainedsults of Mass Flowmeter Detected by Small Mobile and the developing trend of capital constructionStandard Volume Tube. Wang Haiboarchives management of gas station in the futureAbstract: According to the principle of mass was discussedflowmeter detected online by small mobile standard Keyword: capital construction archive, establishvolume tube and the evaluating principle of mea- ment, developmentsurement uncertainty, combining the detection 38. Talk on the Scientific Management of Renova-method provided by JJG 1038-2008Verification tion Project of Oil Depot or Station. Li GuanghuiRegulatCoriolis Mass Flowmeter,taking Wei Dong, Yan Yong, He Jianruonlineection of mass flowmeter by small Abstract: The management of renovation project ofmobile standard volume tube as example, the oil depot or station is discussed from the four asmethod to calculate uncertainty was investigated pects of pre-project management,constructionand analyzedprocess management, project completion and accep-Keyword: small mobile standard volume tube,I tance, and project maintenance management in or-mass flowmeter, measurement, uncertainty evalua- der to achieve the scientific management of renovationtion projectOPERATION MANAGEMENTKeyword: oil depot, renovation project, projectFinancial Property ofmanagementPetroleum Dominated by Futures Market. Liu GAS FILLING STATIOJTiemin41. Discussion on Safety Operation Management inAbstract:The foundation for enhancing financial LNG Filling Station. Liu Weiguoproperty of petroleum, international petroleum Abstract: Combining the safety operation managepricing system dominated by futures market, par- ment of LNG filling station in Guiyang city, theticipants of international petroleum futures market, problems needing attention for safety operation inand the reasons leading prosperous futures market LNG filling station were analyzed. Based on refer-were introduced. It was pointed out that the ences, the safety prevention measures adopted inessence of petroleum safety had turned from "sup- dangerous area of gas filling station, and safety reply safety"mode of"production-supply"type into quirements for staff in operation field were pointedprice safetode of“ trade-fiKeywords: futures market, financial property of Keywords: LNG filling station, safety operationpetroleum,petroleum safety.manageme中国煤化工CNMHG

论文截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。