Failure mechanism of pump chambers and their optimized design in deep mining at Qishan Coal Mine Failure mechanism of pump chambers and their optimized design in deep mining at Qishan Coal Mine

Failure mechanism of pump chambers and their optimized design in deep mining at Qishan Coal Mine

  • 期刊名字:矿业科学技术(英文版)
  • 文件大小:
  • 论文作者:SUN Xiaoming,WU Chuangzhou,CAI
  • 作者单位:State Key Laboratory of Deep Rock Mechanics and Engineering,School of Mechanics and Civil Engineering
  • 更新时间:2022-09-17
  • 下载次数:
论文简介

Pump chambers, normally used as dominant structures in mining engineering to insure the safety and production of un-derground coal mines, become generally deformed under conditions of deep mining. Given the geology and engineering condition of Qishan Coal Mine in Xuzhou, the failure characteristics of pump chambers at the -1000 m level show that the main cause can be attributed to the spatial effect induced by intersectional chambers, where one pump is constructed per well. We developed an opti-mized design of the pump room, in which the pump wells in the traditional design are integrated into one compounding well. We suggest that the new design can limit the spatial effect of intersectional chambers during construction given our relevant numerical simulation. The new design is able to simplify the structure of the pump chamber and reduce the amount of excavation required.Based on a bolt-mesh-anchor with a rigid gap coupling supporting technology, the stability of pump chamber can be improved greatly.

论文截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。