Settlement behavior of coal mine waste in different surrounding rock conditions
- 期刊名字:中南工业大学学报(英文版)
- 文件大小:
- 论文作者:MA Chun-de,LI Xi-bing,HU Bing-
- 作者单位:School of Resources and Safety Engineering,Centre Coal Research Institute
- 更新时间:2022-09-16
- 下载次数:次
In order to investigate the influence of complex conditions of in-situ surrounding rocks on the settlement behavior of nubbly coal mine waste subjected to high gravity pressure, four kinds of loading chambers made of different similar materials with different elastic moduli in experiments were used to simulate the deformation features of in-site rocks, including soft, moderate hardness, hard and extra-hard rocks. The results show that all the settlement-axial load (or axial strain-stress) curves obtained under four different surrounding rock conditions present power-exponential function feature. The final settlement of coal mine waste under the same axial load is closely related to the lumpiness gradations and the deformation behavior of chamber materials used to simulate behaviors of different in-situ surrounding rocks. In the same surrounding rock condition, the final settlement under the same maximum axial load decreases with the decrease of the proportion of larger gradation of coal mine waste. While for the same lumpiness gradation case, the settlement increases with the decrease of elastic modulus of simulated surrounding rocks and the lateral pressure induced by axial load increases with the increase of elastic modulus of loading chambers that are used to simulate different surrounding rocks. The test results also reveal that both the compaction curve and lateral pressure curve show a three-stage behavior, and the duration of each stage, which is closely related to gradations and the deformation feature of loading chamber materials, decreases with the increase of the proportion of the small size of coal mine waste and elastic modulus of the simulated rock materials.
-
C4烯烃制丙烯催化剂 2022-09-16
-
煤基聚乙醇酸技术进展 2022-09-16
-
生物质能的应用工程 2022-09-16
-
我国甲醇工业现状 2022-09-16
-
JB/T 11699-2013 高处作业吊篮安装、拆卸、使用技术规程 2022-09-16
-
石油化工设备腐蚀与防护参考书十本免费下载,绝版珍藏 2022-09-16
-
四喷嘴水煤浆气化炉工业应用情况简介 2022-09-16
-
Lurgi和ICI低压甲醇合成工艺比较 2022-09-16
-
甲醇制芳烃研究进展 2022-09-16
-
精甲醇及MTO级甲醇精馏工艺技术进展 2022-09-16
