Monitoring in Building Road Tunnel Across Coal Measures Monitoring in Building Road Tunnel Across Coal Measures

Monitoring in Building Road Tunnel Across Coal Measures

  • 期刊名字:地球与环境
  • 文件大小:
  • 论文作者:XIE Ye,ZHANG Dong-ming,KANG Hu
  • 作者单位:Chengdu University of Technology,College of Resource and Environmental Science,China Pertoleum Engineering CO.
  • 更新时间:2022-09-16
  • 下载次数:
论文简介

In some cases coal measures,goaf,big caves,and huge faults,as well as high initial stress cannot be avoided in road tunnel excavation.These geological features may make it more difficul practical tunnel construction. So it is necessary to take strong precautious measures against gas outburst,water bursting and roof fall in a tunnel across coal measures with risk of gas outburst.The techniques,such as advance drilling exploration,multiple-cycle shallow depth hole controlled blasting,reinforced supporting,which include concrete grouting and twice supporting,and monitoring measures are often applied in the construction of tunnels and satisfied results are achieved. Results in this paper can help others to get experiences in road tunnel construction with similar geological features.

论文截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。