Establishment and evaluation of operation function model for cascade hydropower station
- 期刊名字:水科学与水工程
- 文件大小:
- 论文作者:Chang-ming JI,Ting ZHOU,Hai-ta
- 作者单位:Business Administration School,Renewable Energy School
- 更新时间:2023-04-16
- 下载次数:次
Toward solving the actual operation problems of cascade hydropower stations under hydrologic uncertainty, this paper presents the process of extraction of statistical characteristics from long-term optimal cascade operation, and proposes a monthly operation function algorithm for the actual operation of cascade hydropower stations through the identification, processing, and screening of available information during long-term optimal operation. Applying the operation function to the cascade hydropower stations on the Jinshajiang-Yangtze River system, the modeled long-term electric generation is shown to have high precision and provide benefits. Through comparison with optimal operation, the simulation results show that the operation function proposed retains the characteristics of optimal operation. Also, the inadequacies and attribution of the algorithm are discussed based on case study, providing decision support and reference information for research on large-scale cascade operation work.
-
C4烯烃制丙烯催化剂 2023-04-16
-
煤基聚乙醇酸技术进展 2023-04-16
-
生物质能的应用工程 2023-04-16
-
我国甲醇工业现状 2023-04-16
-
JB/T 11699-2013 高处作业吊篮安装、拆卸、使用技术规程 2023-04-16
-
石油化工设备腐蚀与防护参考书十本免费下载,绝版珍藏 2023-04-16
-
四喷嘴水煤浆气化炉工业应用情况简介 2023-04-16
-
Lurgi和ICI低压甲醇合成工艺比较 2023-04-16
-
甲醇制芳烃研究进展 2023-04-16
-
精甲醇及MTO级甲醇精馏工艺技术进展 2023-04-16
