 
							 
						Feasibility evaluation for excavation of Naghshe Jahan Square subway station by underground methods
- 期刊名字:岩石力学与岩土工程学报(英文版)
- 文件大小:
- 论文作者:Morteza Abdi Cherlo,Hamid Hash
- 作者单位:Department of Mining Engineering
- 更新时间:2023-04-18
- 下载次数:次
In recent years, in reaction to the increasing usage of urban areas, the excavation of underground spaces has been developed. One of the most challenging issues encountered by engineers is the construction of subway stations as large underground spaces at shallow depth with soft surrounding soils. In this paper, Naghshe Jahan Square subway station located in Isfahan, Iran, has been simulated by geomechanical finite difference method (FDM). This station is located under important historical structures. Therefore, the ground displacement and surface settlement induced by the excavation of the subway station should be strictly controlled. Many of such problems are affected by selected excavation method. For these reasons, different underground excavation methods associated with construction have been studied. In this study, sequential excavation method and large-diameter curved pipe roofing method are used and the numerical results of the two methods are compared. The presence of groundwater table obliges us to choose special techniques for the stability of the ground around the subway station during construction;hence compressed air and ground freezing techniques are utilized in the simulations of the subway station. Finally, after choosing appropriate support systems, the large-diameter curved pipe roofing method with 1.5 m spacing between curved pipes is proposed.
- 
			C4烯烃制丙烯催化剂 2023-04-18
- 
			煤基聚乙醇酸技术进展 2023-04-18
- 
			生物质能的应用工程 2023-04-18
- 
			我国甲醇工业现状 2023-04-18
- 
			JB/T 11699-2013 高处作业吊篮安装、拆卸、使用技术规程 2023-04-18
- 
			石油化工设备腐蚀与防护参考书十本免费下载,绝版珍藏 2023-04-18
- 
			四喷嘴水煤浆气化炉工业应用情况简介 2023-04-18
- 
			Lurgi和ICI低压甲醇合成工艺比较 2023-04-18
- 
			甲醇制芳烃研究进展 2023-04-18
- 
			精甲醇及MTO级甲醇精馏工艺技术进展 2023-04-18

