The demonstration, decision process and practice of Three Gorges Project The demonstration, decision process and practice of Three Gorges Project

The demonstration, decision process and practice of Three Gorges Project

  • 期刊名字:中国工程科学:英文版
  • 文件大小:
  • 论文作者:Pan Jiazheng
  • 作者单位:State Grid Corporation of China
  • 更新时间:2022-10-15
  • 下载次数:
论文简介

The world-famous Three Gorges Project (TGP) is the largest hydropower station in the world and the largest water resources and hydropower project constructed in China. The impoundment of Three Gorges Reservoir reached the design water level of 175 m for the first time on October 26, 2010, which indicated that the project had met design requirements of various functionalities of flood control, power generation and navigation. To complete the project it took nearly 100 years for conception, demonstration, design and construction of the TGP. How was the conception of TGP proposed? What kind of role should it be? What were the different opinions? How was the project demonstrated? What was the conclusion of demonstration? Those are the issues that many people care and don' t know about. To memorize the realization of the century dream of Chinese people and to record the history of development of TGP, the author pres- ents a compendious introduction to the project.

论文截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。