Energy conservation research of dehumidification system for main cable anticorrosion of suspension b
- 期刊名字:中国工程科学(英文版)
- 文件大小:
- 论文作者:Chen Ce,Fan Liangkai,Feng Zhao
- 作者单位:Civil and Transportation College,Jiangsu Provincial Yangtze River Highway Bridge Construction Commanding Department (JPC
- 更新时间:2022-11-28
- 下载次数:次
The necessity of the main cable anticorrosion for suspension bridge is described, and operating principles and composition of main cable dehumidification system are analyzed. An idea using the waste heat of high temperature outlet air of dehumidification system to heat up regeneration air of rotary-type dehumidifier is put forward in this paper. The concrete scheme is to install a heat exchanger on air-out pipeline of roots blower and air-in pipeline of regeneration electric heater of rotary dehumidifier. Air preheated by the heat exchanger enters regeneration electric heater of rotary-type dehumidifier. Energy conservation of main cable dehumidification system for the Yangtze River highway bridge is calculated, and the results show that energy conservation rate can reach 44 %.
-
C4烯烃制丙烯催化剂 2022-11-28
-
煤基聚乙醇酸技术进展 2022-11-28
-
生物质能的应用工程 2022-11-28
-
我国甲醇工业现状 2022-11-28
-
JB/T 11699-2013 高处作业吊篮安装、拆卸、使用技术规程 2022-11-28
-
石油化工设备腐蚀与防护参考书十本免费下载,绝版珍藏 2022-11-28
-
四喷嘴水煤浆气化炉工业应用情况简介 2022-11-28
-
Lurgi和ICI低压甲醇合成工艺比较 2022-11-28
-
甲醇制芳烃研究进展 2022-11-28
-
精甲醇及MTO级甲醇精馏工艺技术进展 2022-11-28
