Combined process of sequencing batch reactor activated sludge process and constructed wetland for do
- 期刊名字:重庆大学学报(英文版)
- 文件大小:
- 论文作者:WEI Wu-qiang,HE Qiang,Wisaam S
- 作者单位:Environment Engineering Research and Design Department, Key Laboratory of Eco-environments in Three Gorges Reservoir Reg
- 更新时间:2022-10-15
- 下载次数:次
By combining sequencing batch reactor (SBR) activated sludge process and constructed wetland (CW), this study is to achieve the domestic wastewater treatment. Our purpose was to determine the optimum operating parameters of the combined process. The process involved advantages and shortages of SBR and CW. Under normal temperature, the 3rd cycle (SBR's operation cycle is 8h: inflow for 1h, limited aeration for 3h, sediment for 1h, outflow for 1h, and idling for 2h; CW's hydraulic retention time (HRT) is 24.8h and hydraulic loading is 24.5m3/m2d) was the best cyclic mode. The effluents can meet the standard GB/T18921-2002: "The reuse of urban recycling water: water quality standard for scenic environment use". In the 3rd cycle, the efficiency of CW was the maximum, and energy consumption of SBR was the minimum. Under the condition of low dissolved oxygen, the removing efficiency of chemical oxygen demand (COD) and ammonia was not affected obviously. Simultaneously, nitrification and denitrification phenomena occured and phosphorus was absorbed obviously.
-
C4烯烃制丙烯催化剂 2022-10-15
-
煤基聚乙醇酸技术进展 2022-10-15
-
生物质能的应用工程 2022-10-15
-
我国甲醇工业现状 2022-10-15
-
JB/T 11699-2013 高处作业吊篮安装、拆卸、使用技术规程 2022-10-15
-
石油化工设备腐蚀与防护参考书十本免费下载,绝版珍藏 2022-10-15
-
四喷嘴水煤浆气化炉工业应用情况简介 2022-10-15
-
Lurgi和ICI低压甲醇合成工艺比较 2022-10-15
-
甲醇制芳烃研究进展 2022-10-15
-
精甲醇及MTO级甲醇精馏工艺技术进展 2022-10-15
