Combined process of sequencing batch reactor activated sludge process and constructed wetland for do Combined process of sequencing batch reactor activated sludge process and constructed wetland for do

Combined process of sequencing batch reactor activated sludge process and constructed wetland for do

  • 期刊名字:重庆大学学报(英文版)
  • 文件大小:
  • 论文作者:WEI Wu-qiang,HE Qiang,Wisaam S
  • 作者单位:Environment Engineering Research and Design Department, Key Laboratory of Eco-environments in Three Gorges Reservoir Reg
  • 更新时间:2022-10-15
  • 下载次数:
论文简介

By combining sequencing batch reactor (SBR) activated sludge process and constructed wetland (CW), this study is to achieve the domestic wastewater treatment. Our purpose was to determine the optimum operating parameters of the combined process. The process involved advantages and shortages of SBR and CW. Under normal temperature, the 3rd cycle (SBR's operation cycle is 8h: inflow for 1h, limited aeration for 3h, sediment for 1h, outflow for 1h, and idling for 2h; CW's hydraulic retention time (HRT) is 24.8h and hydraulic loading is 24.5m3/m2d) was the best cyclic mode. The effluents can meet the standard GB/T18921-2002: "The reuse of urban recycling water: water quality standard for scenic environment use". In the 3rd cycle, the efficiency of CW was the maximum, and energy consumption of SBR was the minimum. Under the condition of low dissolved oxygen, the removing efficiency of chemical oxygen demand (COD) and ammonia was not affected obviously. Simultaneously, nitrification and denitrification phenomena occured and phosphorus was absorbed obviously.

论文截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。