首页 > 资料下载 > CCS前端工程设计报告美国电力登山者CCS II项目一期(2012)CCS Front End Engineering & Design Report American Electric Power
CCS前端工程设计报告美国电力登山者CCS II项目一期(2012)CCS Front End Engineering & Design Report American Electric Power CCS前端工程设计报告美国电力登山者CCS II项目一期(2012)CCS Front End Engineering & Design Report American Electric Power

CCS前端工程设计报告美国电力登山者CCS II项目一期(2012)CCS Front End Engineering & Design Report American Electric Power

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

本《前端工程和设计报告》综合了有关全球CCS研究所的Mountaineer商业规模碳捕集与封存项目的部分非专有设计信息。该报告基于第一阶段–项目定义阶段中开发的初步设计信息,涵盖了2010年2月1日至2011年9月30日期间。该报告包括以下方面的描述和/或讨论:•美国能源部的清洁煤电倡议,总体项目和第一阶段目标,以及美国能源部和美国电力公司(AEP)赞助的项目的历史演变,最终导致了当前项目; •阿尔斯通的冷氨法(CAP)碳捕集改造技术以及碳存储和监测系统; •AEP在工厂运营和集成理念方面的改造方法; •CAP技术的工艺岛设备和工厂系统的平衡; •碳储存系统,用于注水井,监测井,系统监测和控制逻辑原理; •总体项目估算,包括隔夜成本估算,未来年度支出的成本升级以及主要因素,这些风险是基于风险的突发事件的发展因素; •AEP决定在第一阶段结束时中止该项目的进一步工作,尽管它评估了阿尔斯通CAP技术已准备好按预期规模进行商业演示。

This Front End Engineering & Design Report consolidates select nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project for Global CCS Institute. The report is based on the preliminary design information developed during the Phase I – Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: • US DOE’s Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; • Alstom’s Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; • AEP’s retrofit approach in terms of plant operational and integration philosophy; • The process island equipment and balance of plant systems for the CAP technology; • The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; • Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and • AEP’s decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.