附录E美国水域调查报告APPENDIX E INVESTIGATION FOR WATERS OF THE U.S. REPORT
- 资料类别:
- 资料大小:
- 资料编号:
- 资料状态:
- 更新时间:2021-09-09
- 下载次数:次
资料简介
美国电力服务公司(AEP)和美国(U.S.)作为联邦政府的牵头机构,美国能源部(DOE)正计划在其现有的“登山者”(Mountaineer)发电厂(一座1300兆瓦的电厂)和位于西弗吉尼亚州梅森县(Mason County)的其他AEPowned物业中建设一个商业规模的碳捕获与封存(CCS)设施。这个项目(称为登山家CCS II项目)将捕捉二氧化碳(CO2)从现有煤粉发电厂附近的纽黑文,西弗吉尼亚州,将捕获的二氧化碳管道运输至12英里范围内的位置,和生理盐水注入大约150万公吨的二氧化碳捕获形成地球表面下大约1.5英里(永久性地质存储)。AEP正在为这个项目向能源部寻求财政援助。
American Electric Power Service Corporation (AEP) and the United States (U.S.) Department of Energy (DOE), as lead federal agency, are proposing to construct a commercial-scale carbon capture and storage (CCS) facility at its existing Mountaineer Power Plant (a 1,300 megawatt [MW] plant) and other AEPowned properties in Mason County, West Virginia. This project (referred to as the Mountaineer CCS II Project) would capture carbon dioxide (CO2) from this existing pulverized coal power plant located near New Haven, West Virginia, transport the captured CO2 by pipeline to well locations within 12 miles of the plant, and inject approximately 1.5 million metric tons of captured CO2 into saline formations approximately 1.5 miles below the earth's surface (for permanent geologic storage). AEP is seeking financial assistance from DOE for the proposed project.
资料截图
下一条:W.A.教区燃烧后二氧化碳捕获和封存项目缓解行动计划Mitigation Action Plan for the W.A. Parish Post-Combustion CO 2 Capture an
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
热门推荐
-
化学工程手册(第三版套装5册第1卷2卷3卷4卷5卷)袁渭康 王静康 费维扬 欧阳平凯 著 2021-09-09
-
石油化工自动控制设计手册(第四版) 黄步余 化工出版社 2020年 2021-09-09
-
化工过程模拟实训——Aspen Plus教程(第二版)孙兰义 化学工业出版社 2017年 2021-09-09
-
化工装置实用操作技术指南 韩文光2001年化学工业出版社 2021-09-09
-
HAZOP分析方法及实践 粟镇宇 化学工业出版社2018年 2021-09-09
-
工业除尘设备设计手册 张殿印 申丽 化工出版社 2012年 2021-09-09
-
回转窑(设计、使用与维修)沈阳铝镁设计院、长沙有色冶金设计院共同编写 2021-09-09
-
加拿大煤炭开采Coal Mining in Canada 2021-09-09
-
化工节能技术手册 王文堂 2006年化学工业出版社 2021-09-09
-
年终总结新年计划工作汇报PPT模板 2021-09-09