首页 > 资料下载 > 化石能源发电厂柜台参考Fossil Energy Power Plant Desk Reference
化石能源发电厂柜台参考Fossil Energy Power Plant Desk Reference 化石能源发电厂柜台参考Fossil Energy Power Plant Desk Reference

化石能源发电厂柜台参考Fossil Energy Power Plant Desk Reference

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

化石能源工厂的成本和性能基准的目标;第1卷(含沥青的煤和天然煤) 燃气到电力)是确定成本和性能估计的短期商业产品为 发电厂,有无现有的碳捕获和封存(CCS)技术。研究 对所有被检查的技术使用一致的设计要求,以及最新的性能和资金 成本估计。研究时间重点放在现在建成并于2010年投入使用的工厂上。每座工厂都建成了。 在美国中西部的一个绿地里。

The objective of the Cost and Performance Baseline for Fossil Energy Plants; Volume 1 (Bituminous Coal and Natural Gas to Electricity) is to determine cost and performance estimates of the near-term commercial offerings for power plants, both with and without current technology for carbon capture and sequestration (CCS). The study uses consistent design requirements for all technologies examined, as well as up-to-date performance and capital cost estimates. The study timeframe focuses on plants built now and commissioned in 2010. Each plant is built at a greenfield site in the midwestern United States.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。