美国能源部已决定在西部绿蔷薇联合生产示范项目《最终环境影响报告书》(DOE/ ez - 0361;2007年11月)(范)。另一种选择是通过清洁煤炭电力倡议(CCPI)项目下的合作协议,向西Greenbrier Co-Generation, LLC (WGC)提供约1.075亿美元(高达开发成本的50%),用于在西弗吉尼亚州Greenbrier县的Rainelle建立联合生产设施。这笔资金将被用于WGC设计、构建和演示一个98兆瓦(净)电厂和水泥制造设备基于一个创新的大气压力循环流化床(CFB)锅炉紧凑的反气旋发电和蒸汽通过燃烧大约3000到4000吨/天的煤矸石从几个地方网站。
DOE has decided to implement the Proposed Action alternative, identified as the preferred alternative, in the Western Greenbrier Co-Production Demonstration Project, Final Environmental Impact Statement (DOE/EIS–0361; November 2007) (FEIS). That alternative is to provide approximately $107.5 million (up to 50% of the development costs) to Western Greenbrier Co-Generation, LLC (WGC) through a cooperative agreement under the Clean Coal Power Initiative (CCPI) Program for a Co-Production Facility to be located at Rainelle in Greenbrier County, West Virginia. This funding will be used by WGC to design, construct and demonstrate a 98 megawatt (net) power plant and cement manufacturing facility based on an innovative atmospheric-pressure circulating fluidized bed (CFB) boiler with a compact inverted cyclone to generate electricity and steam by burning approximately 3,000 to 4,000 tons per day of coal refuse from several local sites.
资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
热门推荐
-
化学工程手册(第三版套装5册第1卷2卷3卷4卷5卷)袁渭康 王静康 费维扬 欧阳平凯 著 2021-09-09
-
石油化工自动控制设计手册(第四版) 黄步余 化工出版社 2020年 2021-09-09
-
化工过程模拟实训——Aspen Plus教程(第二版)孙兰义 化学工业出版社 2017年 2021-09-09
-
化工装置实用操作技术指南 韩文光2001年化学工业出版社 2021-09-09
-
HAZOP分析方法及实践 粟镇宇 化学工业出版社2018年 2021-09-09
-
工业除尘设备设计手册 张殿印 申丽 化工出版社 2012年 2021-09-09
-
回转窑(设计、使用与维修)沈阳铝镁设计院、长沙有色冶金设计院共同编写 2021-09-09
-
加拿大煤炭开采Coal Mining in Canada 2021-09-09
-
化工节能技术手册 王文堂 2006年化学工业出版社 2021-09-09
-
年终总结新年计划工作汇报PPT模板 2021-09-09