制定XI计划的煤炭和褐煤工作组在XI计划末期(即2012-13)评估了772.00 MT的煤炭需求,计划委员会在2012年1月19日的年度计划讨论中评估了煤炭需求。 据估计,2011-12年(BE,RE)和2012-13(BE)的全印度煤炭需求分别为696.03公吨,649.87公吨和772.84公吨。 部门明智的分工如下:

The Working Group for Coal & Lignite for formulation of XI Plan has assessed the coal demand of 772.00 MT in the terminal year XI Plan i.e. 2012-13 which was assessed by the Planning Commission during Annual Plan Discussion on 19.1.2012. The All India coal demand for the year 2011-12 (BE,RE) and 2012-13 (BE ) have been assessed as 696.03 MT, 649.87MT and 772.84 MT respectively. The Sector wise break-up is as under: