首页 > 资料下载 > 加利福尼亚州圣华金县太平洋天然气和电力公司压缩空气储能压缩试验阶段项目未发现重大影响FINDING OF NO SIGNIFICANT IMPACT FOR THE PACIFIC GAS AND E
加利福尼亚州圣华金县太平洋天然气和电力公司压缩空气储能压缩试验阶段项目未发现重大影响FINDING OF NO SIGNIFICANT IMPACT FOR THE PACIFIC GAS AND E 加利福尼亚州圣华金县太平洋天然气和电力公司压缩空气储能压缩试验阶段项目未发现重大影响FINDING OF NO SIGNIFICANT IMPACT FOR THE PACIFIC GAS AND E

加利福尼亚州圣华金县太平洋天然气和电力公司压缩空气储能压缩试验阶段项目未发现重大影响FINDING OF NO SIGNIFICANT IMPACT FOR THE PACIFIC GAS AND E

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-23
  • 下载次数:
资料简介

摘要:美国能源部完成了加利福尼亚州圣华金县太平洋天然气电力公司(PG&E)压缩空气储能(CAES)压缩测试阶段项目的最终环境评估(DOE/EA-1752)。根据环境评估(EA)的分析,美国能源部决定向PG&E提供高达2500万美元的财政援助,用于建设和运营CAES压缩测试阶段的项目,这不会造成任何重大的负面影响。PG&E建议建设、运营和退役注采井、空气压缩设备,以及相关的临时现场设施,以便对枯竭的天然气田进行压缩测试。该项目将模拟CAES设施的运行,以确定地质和工程的适用性。Mokelunne河地质地层位于加利福尼亚州圣华金县金岛。CAES压缩测试项目将创造临时的建筑工作,并进一步促进PG&E和美国能源部对CAES作为智能电网技术的理解

SUMMARY: DOE completed the Final Environmental Assessment for the Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase Project, San Joaquin County, California (DOE/EA-1752). Based on the analysis in the environmental assessment (EA), DOE determined that its proposed action of providing up to $25 million in financial assistance to PG&E for construction and operation of a CAES compression testing phase project would not result in any significant adverse impacts. PG&E proposes construction, operation and decommissioning of an injection and withdrawal well, air compression equipment, and associated temporary site facilities required to conduct compression testing of a depleted natural gas field. The project would simulate operation of a CAES facility to confirm geological and engineering suitability for this use. The Mokelunne River geologic formation is located on King Island, San Joaquin County, California. The CAES compression testing project would create temporary construction jobs and further PG&E and DOE's understanding of CAES as a Smart Grid technology

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。