首页 > 资料下载 > 西部绿蔷薇合作生产示范项目最终环境影响报告书第1卷,共3卷DOE/EIS-0361WESTERN GREENBRIER CO-PRODUCTION DEMONSTRATION PROJECT FINA
西部绿蔷薇合作生产示范项目最终环境影响报告书第1卷,共3卷DOE/EIS-0361WESTERN GREENBRIER CO-PRODUCTION DEMONSTRATION PROJECT FINA 西部绿蔷薇合作生产示范项目最终环境影响报告书第1卷,共3卷DOE/EIS-0361WESTERN GREENBRIER CO-PRODUCTION DEMONSTRATION PROJECT FINA

西部绿蔷薇合作生产示范项目最终环境影响报告书第1卷,共3卷DOE/EIS-0361WESTERN GREENBRIER CO-PRODUCTION DEMONSTRATION PROJECT FINA

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

最终环境影响报告书(EIS)对西方绿蔷薇合作示范项目提供信息的潜在环境影响美国能源部(DOE)的提案提供联邦财政援助的建设和示范98兆瓦(兆瓦)净电厂和水泥制造工厂位于Rainelle的直辖市,绿蔷薇县西维吉尼亚州。west Greenbrier Co-Generation, LLC (WGC)计划设计、建造和运营一座常压循环流化床(CFB)发电厂,该发电厂将通过每天燃烧约3000至4000吨当地的煤渣作为燃料来源来发电和蒸汽。该设施将通过美国能源部和世界煤炭公司在清洁煤炭发电倡议项目下的合作协议进行建设和演示。能源部的支持将达到大约1.075亿美元(最高50%)的拟议设施的开发成本。该发电厂将是CFB燃烧室在美国的第一个商业应用,该燃烧室具有紧凑的反向旋风设计。最终环境影响报告书(EIS)对西方绿蔷薇合作示范项目提供信息的潜在环境影响美国能源部(DOE)的提案提供联邦财政援助的建设和示范98兆瓦(兆瓦)净电厂和水泥制造工厂位于Rainelle的直辖市,绿蔷薇县西维吉尼亚州。west Greenbrier Co-Generation, LLC (WGC)计划设计、建造和运营一座常压循环流化床(CFB)发电厂,该发电厂将通过每天燃烧约3000至4000吨当地的煤渣作为燃料来源来发电和蒸汽。该设施将通过美国能源部和世界煤炭公司在清洁煤炭发电倡议项目下的合作协议进行建设和演示。能源部的支持将达到大约1.075亿美元(最高50%)的拟议设施的开发成本。该发电厂将是CFB燃烧室在美国的第一个商业应用,该燃烧室具有紧凑的反向旋风设计。

The Final Environmental Impact Statement (EIS) for the Western Greenbrier Co-Production Demonstration Project provides information about the potential environmental impacts of the U.S. Department of Energy’s (DOE’s) proposal to provide federal financial assistance for the construction and demonstration of a 98 megawatt (MWe) net power plant and cement manufacturing facility to be located in the municipality of Rainelle, Greenbrier County, West Virginia. Western Greenbrier Co-Generation, LLC (WGC) proposes to design, construct, and operate an atmospheric pressure circulating fluidized-bed (CFB) power plant that would generate electricity and steam by burning approximately 3,000 to 4,000 tons per day of coal refuse from several local sites as fuel sources. The facility would be constructed and demonstrated through a cooperative agreement between DOE and WGC under the Clean Coal Power Initiative Program. DOE’s support would amount to approximately $107.5 million (up to 50%) of the development cost for the proposed facility. The proposed power plant would be the first commercial application within the United States of a CFB combustor featuring a compact inverted cyclone design. The Final Environmental Impact Statement (EIS) for the Western Greenbrier Co-Production Demonstration Project provides information about the potential environmental impacts of the U.S. Department of Energy’s (DOE’s) proposal to provide federal financial assistance for the construction and demonstration of a 98 megawatt (MWe) net power plant and cement manufacturing facility to be located in the municipality of Rainelle, Greenbrier County, West Virginia. Western Greenbrier Co-Generation, LLC (WGC) proposes to design, construct, and operate an atmospheric pressure circulating fluidized-bed (CFB) power plant that would generate electricity and steam by burning approximately 3,000 to 4,000 tons per day of coal refuse from several local sites as fuel sources. The facility would be constructed and demonstrated through a cooperative agreement between DOE and WGC under the Clean Coal Power Initiative Program. DOE’s support would amount to approximately $107.5 million (up to 50%) of the development cost for the proposed facility. The proposed power plant would be the first commercial application within the United States of a CFB combustor featuring a compact inverted cyclone design.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。