首页 > 资料下载 > 最终报告第8部分Section8-FINAL
最终报告第8部分Section8-FINAL 最终报告第8部分Section8-FINAL

最终报告第8部分Section8-FINAL

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

对于拟议的设施,一些资源承诺将是不可逆转和无法收回的;也就是说,这些资源既不能再生,也不能回收供将来使用。在建设期间不可逆转或不可挽回地使用的资源包括碎石、沙子、木材、水、柴油燃料、汽油、用于生产钢铁的铁矿石和煤炭。在示范期间将不可逆转或不可挽回地使用的资源包括煤、水、天然气(在气化炉不运行期间,在燃气轮机和管道燃烧器启动和燃烧期间使用),以及少量的工艺化学品、油漆、脱脂剂和润滑剂。与拟议设施的规模和地点相比,这些资源都不短缺。

For the proposed facilities, some of the resource commitments would be irreversible and irretrievable; that is, the resources would be neither renewable nor recoverable for future use. Resources that would be irreversibly or irretrievably used during construction would include crushed stone, sand, lumber, water, diesel fuel, gasoline, and iron ore and coal used to produce steel. Resources that would be irreversibly or irretrievably used during the demonstration would include coal, water, natural gas (used during startup and fired in the gas combustion turbine and duct burners during periods when the gasifier was not operating), and small quantities of process chemicals, paints, degreasers, and lubricants. None of these resources is in short supply relative to the size and location of the proposed facilities.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。