首页 > 资料下载 > Kemper County IGCC项目环境影响报告草案DOE/EIS-0409D第1卷(2009年)KEMPER COUNTY IGCC PROJECT DRAFT ENVIRONMENTAL IM
Kemper County IGCC项目环境影响报告草案DOE/EIS-0409D第1卷(2009年)KEMPER COUNTY IGCC PROJECT DRAFT ENVIRONMENTAL IM Kemper County IGCC项目环境影响报告草案DOE/EIS-0409D第1卷(2009年)KEMPER COUNTY IGCC PROJECT DRAFT ENVIRONMENTAL IM

Kemper County IGCC项目环境影响报告草案DOE/EIS-0409D第1卷(2009年)KEMPER COUNTY IGCC PROJECT DRAFT ENVIRONMENTAL IM

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

环境影响报告书草案评估了美国能源部提议的一项行动可能产生的环境影响,该行动旨在为密西西比州肯珀县的先进发电厂的建设和运营提供成本分摊资金,并可能提供贷款担保。该项目是在美国能源部的清洁煤炭电力倡议下选定的,以演示IGCC技术。密西西比电力公司也被邀请根据2005年的能源政策法案提交一份正式的贷款担保申请。发电组件(即在美国,煤炭气化炉、合成气(syngas)清洁系统、联合循环装置和配套基础设施将把煤炭转化成合成气来驱动燃气轮机,而燃气轮机排出的热废气将从水中产生蒸汽来驱动汽轮机。这三个涡轮机合在一起将产生582兆瓦的电力。尽管能源部的资金只会支持IGCC电厂,但该项目将包括新建输电线路和升级一些现有的输电线路、一个地表褐煤矿、一条天然气供应管道、一条再生水供应管道和一条二氧化碳管道。这些设施的建造和操作在本“环境影响报告书”草案中被视为相互关联的行动。

This Draft EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding and possibly a loan guarantee for construction and operation of advanced power generation plant in Kemper County, Mississippi. The project was selected under DOE’s Clean Coal Power Initiative to demonstrate IGCC technology. Mississippi Power also was invited to submit a formal application for a loan guarantee under the Energy Policy Act of 2005. The power generation components (i.e., coal gasifiers, synthesis gas [syngas] cleanup systems, combined-cycle unit, and supporting infrastructure) would convert coal into syngas to drive gas combustion turbines, and hot exhaust gas from the gas turbines would generate steam from water to drive a steam turbine. Combined, the three turbines would generate a nominal 582 megawatts (MW) of electricity. Although DOE funding would support only the IGCC power plant, the project would include new electrical power transmission lines and upgrades of some existing transmission lines, a surface lignite mine, a natural gas supply pipeline, a reclaimed water supply pipeline, and a carbon dioxide pipeline. The construction and operation of these facilities are considered connected actions in this Draft EIS.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。