首页 > 资料下载 > The benchmark price of wind power is changed to the guide price, and onshore wind power may fully en
The benchmark price of wind power is changed to the guide price, and onshore wind power may fully en The benchmark price of wind power is changed to the guide price, and onshore wind power may fully en

The benchmark price of wind power is changed to the guide price, and onshore wind power may fully en

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-20
  • 下载次数:
资料简介

Coal to gas, as a "high energy consumption, high pollution, high water consumption" coal conversion and utilization product, has been restricted and contained until 2011; however, in just three years, the national policy has shifted from the initial restrictions to promoting demonstration projects. In 2014, the energy guidance proposed to actively promote the industrialization of coal to gas, and proposed the goal of reaching 50 billion cubic meters by 2020. However, in terms of technology maturity, economic uncertainty, environment and external cost of climate change, there are still many obstacles in the development of coal to gas industrialization in order to achieve this output goal. We believe that at this stage, we should strengthen the demonstration of coal to gas technology and test whether the technology is mature from multiple perspectives; before the demonstration project practice proves that the new technology breakthrough, the competitiveness of coal to gas is very weak, so it should not be regarded as the industrial scale development.

生态环境部近日批复《中俄东线天然气管道工程(长岭-永清)环境影响报告书》,表示原则同意其环评总体结论和各项生态环境保护措施。中俄东线天然气管道工程(长岭-永清)起自吉林省长岭分输站(不含),止于河北省永清联络压气站(含),管线全长1110公里。

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。