首页 > 资料下载 > CCS集成报告美国电力登山者CCS II项目一期(2011年)CCS INTEGRATION REPORT American Electric Power Mountaineer CCS II Pro
CCS集成报告美国电力登山者CCS II项目一期(2011年)CCS INTEGRATION REPORT American Electric Power Mountaineer CCS II Pro CCS集成报告美国电力登山者CCS II项目一期(2011年)CCS INTEGRATION REPORT American Electric Power Mountaineer CCS II Pro

CCS集成报告美国电力登山者CCS II项目一期(2011年)CCS INTEGRATION REPORT American Electric Power Mountaineer CCS II Pro

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-22
  • 下载次数:
资料简介

该报告将涵盖以下领域,并描述在每个领域进行集成的设计基础:向CAP供汽和蒸汽冷凝水返回o蒸汽从主涡轮机供应,冷凝水返回至主机给水加热系统。 来自CAP的烟气o离开CAP的烟气返回到现有的Mountaineer烟囱,以排放到大气中。

The report will cover the following areas and describe the design basis for integration in each area:  Steam supply to the CAP and steam condensate return o Steam is supplied from the main turbine and condensate returned to the main unit feed water heating system.  Flue gas exhaust from the CAP o Flue gas exiting the CAP is returned to the existing Mountaineer stack for exhaust to atmosphere.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。